The Swift Package Index logo.Swift Package Index

Build Information

Successful build of ModelValidator with Swift 5.10 for Linux.

Build Command

bash -c docker run --rm -v "checkouts-4606859-1":/host -w "$workDir" registry.gitlab.com/finestructure/spi-images:basic-5.10-latest swift build 2>&1

Build Log

========================================
RunAll
========================================
Builder version: 4.29.0
Interrupt handler set up.
========================================
Checkout
========================================
Clone URL: https://github.com/railwaymen/ModelValidator.git
Reference: master
Initialized empty Git repository in /host/spi-builder-workspace/.git/
hint: Using 'master' as the name for the initial branch. This default branch name
hint: is subject to change. To configure the initial branch name to use in all
hint: of your new repositories, which will suppress this warning, call:
hint:
hint: 	git config --global init.defaultBranch <name>
hint:
hint: Names commonly chosen instead of 'master' are 'main', 'trunk' and
hint: 'development'. The just-created branch can be renamed via this command:
hint:
hint: 	git branch -m <name>
From https://github.com/railwaymen/ModelValidator
 * branch            master     -> FETCH_HEAD
 * [new branch]      master     -> origin/master
HEAD is now at 2d1dd91 Merge pull request #24 from railwaymen/validators-1.0-branch
Cloned https://github.com/railwaymen/ModelValidator.git
Revision (git rev-parse @):
2d1dd91521476d47573d9e7939a2288deb841640
SUCCESS checkout https://github.com/railwaymen/ModelValidator.git at master
========================================
Build
========================================
Selected platform:         linux
Swift version:             5.10
Building package at path:  $workDir
https://github.com/railwaymen/ModelValidator.git
Running build ...
bash -c docker run --rm -v "checkouts-4606859-1":/host -w "$workDir" registry.gitlab.com/finestructure/spi-images:basic-5.10-latest swift build 2>&1
Building for debugging...
[0/2] Write sources
[1/2] Write swift-version-24593BA9C3E375BF.txt
[3/23] Emitting module ModelValidator
[4/25] Compiling ModelValidator BasicValidationError.swift
[5/25] Compiling ModelValidator Collection+Extension.swift
[6/25] Compiling ModelValidator Optional+Extension.swift
[7/25] Compiling ModelValidator EndsWithValidator.swift
[8/25] Compiling ModelValidator InValidator.swift
[9/25] Compiling ModelValidator NilIgnoringValidator.swift
[10/25] Compiling ModelValidator ValidatorType.swift
[11/25] Compiling ModelValidator Validatable.swift
[12/25] Compiling ModelValidator Validations.swift
[13/25] Compiling ModelValidator CountValidator.swift
[14/25] Compiling ModelValidator EmailValidator.swift
[15/25] Compiling ModelValidator EmptyValidator.swift
[16/25] Compiling ModelValidator RangeValidator.swift
[17/25] Compiling ModelValidator RegexpValidator.swift
[18/25] Compiling ModelValidator NilValidator.swift
[19/25] Compiling ModelValidator NotValidator.swift
[20/25] Compiling ModelValidator OrValidator.swift
[21/25] Compiling ModelValidator Validator.swift
[22/25] Compiling ModelValidator AndValidator.swift
[23/25] Compiling ModelValidator ContainsValidator.swift
[24/25] Compiling ModelValidator StartsWithValidator.swift
[25/25] Compiling ModelValidator URLValidator.swift
Build complete! (8.18s)
Build complete.
Done.

Build Machine: Linux 1